Analisis Faktor-Faktor Resiko Pekerjaan Bor Pile, Balok, Dan Kolom Pada Proyek Pembangunan RSUD Pandan Arang
DOI:
https://doi.org/10.31941/jurnalpena.v37i1.2886Keywords:
Project delays, constraint, solutionAbstract
In the implementation of construction projects, it cannot be separated from problems in project implementation which may be caused by various factors. Of course, in the implementation process there are a number of obstacles that occur in relation to one another and result in other work being disrupted or delayed. This analysis aims to determine the factors that cause obstacles in the Class III Inpatient Building Construction Project of Pandan Arang Hospital. The results of the analysis show that the factors that hinder the completion of the project are the death of heavy equipment used in soil preparation work, hitting a large rock during drilling, flooding during drilling, lack of reinforcing iron fabrication area, porousness during formwork removal, casting carried out during rainy days.
References
Rossela, A., & Hudori, M. (2021, April). Analisis Faktor Penyebab kendala Pada Proyek Peningkatan Jalan (Studi Kasus: Jalan Simpang Marina-Simpang Base Camp Kota Batam). In ConCEPt-Conference on Community Engagement Project (Vol. 1, No. 1, pp. 67-70).
BADUNG, K. D. K. (2022). UPAYA PENANGGULANGAN KETERLAMBATAN PELAKSANAAN PROYEK. Jurnal Spektran, 10(1).
Kurniawan, F., Wulandari, D. A. R., & Ayu, L. A. (2018). Studi Kasus Keterlambatan Proyek Konstruksi Di Provinsi Jawa Timur Berdasarkan Kontrak Kerja. Narotama Jurnal Teknik Sipil, 2(2), 21-31.
Kurniawan, H. (2014). Studi Faktor Penghambat Pelaksanaan Konstruksi di Daerah Istimewa Yogyakarta (Doctoral dissertation, UAJY).
Natalia, M., Riswandi, R., Mirani, Z., Partawijaya, Y., & Misriani, M. (2018). Faktor Penyebab Kegagalan Akibat Keterlambatan Proyek Konstruksi Pada Bangunan Gedung di Kota Padang. Jurnal Ilmiah Rekayasa Sipil, 15(2), 88-98.
Priyanto, B., & Yuliansyah, A. I. (2022, August). Mengungkap Faktor-Faktor Penyebab Pembengkakan Biaya pada Proyek Pembangunan Apartemen di Surakarta. In Prosiding Seminar Nasional Teknik Sipil UMS (pp. 166-170).
Muklis Indarto, 2019. Proyek Pembangunan Gedung B Tahap 1 Rumah Sakit Umum Daerah Cilacap (IGD, RAUNG O.K, RAWAT INAP, INSTALASI RADIOLOGI DAN INSTALASI LABORATORIUM). Surakarta: Universitas Muhammadiyah Surakarta.
Yanto, Y., & Budi Priyanto, S. T. (2022). Identifikasi Faktor-Faktor Resiko Kritis Pada Perumahan Di Kabupaten Karanganyar (Doctoral dissertation, Universitas Muhammadiyah Surakarta).
Setyadi, A. W., & Budi Priyanto, S. T. (2020). Identifikasi Dan Klasifikasi Tingkat Resiko Pada Pengembang Perumahan Di Kabupaten Sukoharjo (Doctoral dissertation, Universitas Muhammadiyah Surakarta).
Downloads
Published
Issue
Section
License
- Hak publikasi jurnal menjadi milik pengelola jurnal dengan sepengetahuan penulis, sedangkan hak moral publikasi menjadi milik penulis.
- Aspek legal formal terhadap aksesibilitas publikasi jurnal mengacu pada lisensi Creative Commons Atribusi-NonCommercial-No Derivative (CC BY-NC-ND), yangberarti bahwa publikasi dapat dimanfaatkan dengan tujuan non-komersial dan dalam bentuk aslinya (tidak dapat dimodifikasi).
- Setiap publikasi jurnal (cetak/elektronik) bersifat open access untuk tujuan pendidikan, penelitian, dan perpustakaan. Di luar tujuan tersebut, pengelola jurnal tidak bertanggung jawab atas pelanggaran hak cipta yang dilakukan oleh pihak tertentu.