Social, Economic, Legal, And Cultural Impacts of Land Acquisition For The Construction of The Ngawi- Kartasura Toll Road Segment

Authors

  • Setiowati Setiowati Sekolah Tinggi Pertanahan Nasional, Yogyakarta
  • Senthot Sudirman Sekolah Tinggi Pertanahan Nasional, Yogyakarta
  • Dian Dewi Khasanah Sekolah Tinggi Pertanahan Nasional, Yogyakarta

DOI:

https://doi.org/10.31941/pj.v23i1.4924

Abstract

The construction of the Ngawi - Kartasura Toll Road Segment, part of the 90.1-kilometer Solo - Ngawi Toll Road project, aims to improve connectivity and economic growth in Java, but also brings complex impacts in the land acquisition process. This process raises various social, economic, legal, and cultural challenges that require a holistic and participatory approach, including impact mitigation strategies, transparency, and integration with comprehensive regional development planning. This research aims to analyze the social, economic, legal, and cultural impacts of the land acquisition process for the construction of the Ngawi - Kartasura Toll Road Segment on affected communities, as well as evaluate the effectiveness of land acquisition policies and implementation in mitigating negative impacts and maximizing development benefits for local communities. This research uses normative legal research methods with statutory and conceptual approaches, focusing on the analysis of primary, secondary, and tertiary legal materials through literature study. The data analysis technique uses qualitative analysis methods with deductive reasoning. The results show that the land acquisition process for the construction of the Ngawi - Kartasura Toll Road Segment has multidimensional impacts on affected communities, including social, economic, legal, and cultural aspects. Although there are comprehensive legal foundations and mechanisms for impact mitigation and benefit optimization, the effectiveness of their implementation still varies in the field. Efforts to mitigate negative impacts and maximize benefits have been made, but still face challenges such as inconsistencies in land data, land speculation, and community resistance. To improve effectiveness, a more holistic and participatory approach is needed, including strengthening community participation, improving data accuracy, strengthening local government capacity, and better integration with regional development planning.

Downloads

Download data is not yet available.

References

Abdullah, S. (2013). POTENSI DAN KEKUATAN MODAL SOSIAL DALAM SUATU KOMUNITAS. SOCIUS: Jurnal Sosiologi, 12(1).

Ahmad, F. salam. (2022). Dampak Pembangunan Jalan Tol Trans Jawa terhadap Pertumbuhan Ekonomi di Jawa Tengah. Jurnal Ekonomi Dan Kebijakan Pembangunan, 11(1), 1–18. https://doi.org/10.29244/jekp.11.1.2022.1-18

Anisah, A., Soedwiwahjono, S., & Miladan, N. (2018). ANALISIS PERKEMBANGAN WILAYAH KECAMATAN KARTASURA SEBAGAI KAWASAN STRATEGIS CEPAT TUMBUH. TATALOKA, 20(4), 486. https://doi.org/10.14710/tataloka.20.4.486-499

Arif, M. F. (2016). Makna Kepentingan Umum Dalam Pengadaan Tanah Untuk Jalan Tol Dalam Perspektif Undang-undang Nomor 2 Tahun 2012 Tentang Pengadaan Tanah Bagi Pembangunan Untuk Kepentingan Umum. Jurnal Mahasiswa Fakultas Hukum Universitas Brawijaya.

Asri, M., & Komar, O. (2016). PEMANFAATAN HASIL PELATIHAN KETERAMPILAN DAN PERAN PENDAMPING DALAM MENINGKATKAN KEMANDIRIAN USAHA (Studi Pada Program Desa Vokasi di Desa Cisaat Kecamatan Ciater Kabupaten Subang Provinsi Jawa Barat). Jurnal Pendidikan Luar Sekolah, 12(2).

Astri, H. (2011). PENYELESAIAN KONFLIK SOSIAL MELALUI PENGUATAN KEARIFAN LOKAL. Aspirasi: Jurnal Masalah-Masalah Sosial, 2(2). https://doi.org/https://doi.org/10.46807/aspirasi.v2i2.439

Butar, I. E. H. B., Lay, B. P., Christine, V. E., Amloki, M. K. A., Taek, V., Mawar, E. R., Loyrede, P. G., & Oki, A. N. (2023). Proses Pengadaan Tanah untuk Kepentingan Umum Menurut Undang-Undang No. 2 Tahun 2012. JIKMA: Jurnal Ilmiah Dan Karya Mahasiswa, 1(3). https://doi.org/https://doi.org/10.54066/jikma.v1i3.348

Faizrosadi, N., Priyono, P., & Cahyaningtyas, I. (2020). PENITIPAN GANTI RUGI PEMEGANG HAK DALAM PENGADAAN TANAH PEMBANGUNAN JALAN TOL BATANG. NOTARIUS, 13(2), 605–618. https://doi.org/10.14710/nts.v13i2.31081

Fatkhullah, M., & Mulyani, I. (2024). ANALISIS POTENSI PENGEMBANGAN PARIWISATA DI KOTA DUMAI. Journal of Islamic Tourism Halal Food Islamic Traveling and Creative Economy, 4(1), 19–37. https://doi.org/10.21274/ar-rehla.v4i1.9057

Febriyana, N. (2020). DAMPAK PEMBANGUNAN JALAN TOL NGAWI-SOLO TERHADAP KONDISI SOSIAL EKONOMI PENDUDUK TERGUSUR DI DESA WIDODAREN, KECAMATAN WIDODAREN, KABUPATEN NGAWI. Universitas Muhammadiyah Surakarta.

K. Harjono, D. (2023). Tanggung Jawab Penilai dalam Pengadaan Tanah bagi Pembangunan untuk Kepentingan Umum. Jurnal Hukum Indonesia, 2(1), 14–24. https://doi.org/10.58344/jhi.v1i2.7

Khasanah, U., Nugraha, N., & Kokotiasa, W. (2017). DAMPAK PEMBANGUNAN JALAN TOL SOLO-KERTOSONOTERHADAP HAK EKONOMI MASYARAKAT DESA KASREMAN KECAMATAN GENENG KABUPATEN NGAWI. Citizenship Jurnal Pancasila Dan Kewarganegaraan, 5(2), 108. https://doi.org/10.25273/citizenship.v5i2.1644

Lempoy, P. G. (2017). Kajian Hukum Hak Atas Tanah Tanpa Sertifikat Yang Diduduki Seseorang Menurut Pasal 1963 Kuhperdata. Lex Crimen, 6(2).

Masruroh, N., Fardian, I., Febriyanti, N., Muflihin, M. D., Supriyanti, S. S., Islami, P. Y. N., Ilmiah, D., Anas, A. T., Panggiarti, E. K., Honggowati, S., Arifah, S., Aziz, A., Mualimin, J., Wusqo, U., Sujono, R. I., Layli, M., Amrina, D. H., Bayu, Firdaus, M. A., … Dahlan, R. (2022). EKONOMI SIRKULAR DAN PEMBANGUNAN BERKELANJUTAN. Jejak Pustaka.

Masturi, R. (2018). HAKEKAT KEADILAN PADA PENGADAAN TANAH UNTUK KEPENTINGAN UMUM DALAM RANGKA PEMBANGUNAN NASIONAL. Al-Ishlah: Jurnal Ilmiah Hukum, 21(2).

Muliawan, J. W. (2018). CARA MUDAH PAHAMI PENGADAAN TANAH UNTUK PEMBANGUNAN MELALUI KONSEP 3 IN 1 IN THE LAND ACQUISITION / HOW TO EASILY UNDERSTAND LAND PROCUREMENT FOR DEVELOPMENT USING 3 IN 1 IN THE LAND ACQUISITION CONCEPT. Jurnal Hukum Peratun, 1(2), 163–182. https://doi.org/10.25216/peratun.122018.163-182

Nayoan, F., & Prasetyo, P. K. (2020). Partisipasi Masyarakat dalam Pengadaan Tanah Untuk Pembangunan Bagi Kepentingan Umum di Muara Rupit Sumatera Selatan. Tunas Agraria, 3(2), 86–100. https://doi.org/10.31292/jta.v3i2.109

Noor, T. R., Hamdan, A., Saifuddin, & Fanan, M. A. (2017). ANALISIS DAMPAK SOSIAL EKONOMI PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO (Studi Kasus Kondisi Sosial Ekonomi Masyarakat di Kec. Wringinanom, Kec. Kedamean, Kec. Driyorejo Kabupaten Gresik). Prosiding Seminar Nasional & Temu Ilmiah Jaringan Peneliti, 1(3).

Rahmadani, P. (2022). Penyelesaian Sengketa Ganti Kerugian Pengadaan Tanah Untuk Pembangunan Jalan Tol Section Binjai-Pangkalan Brandan Berbasis Perlindungan Hukum. Locus Journal of Academic Literature Review, 1(4). https://doi.org/10.56128/ljoalr.v1i4.68

Rato, D. (2021). PERLINDUNGAN HAM MASYARAKAT HUKUM ADAT YANG BHINNEKA TUNGGAL IKA DI ERA DIGITAL. Majalah Hukum Nasional, 51(2). https://doi.org/https://doi.org/10.33331/mhn.v51i2.147

Rejekiningsih, T. (2016). ASAS FUNGSI SOSIAL HAK ATAS TANAH PADA NEGARA HUKUM (SUATU TINJAUAN DARI TEORI, YURIDIS DAN PENERAPANNYA DI INDONESIA). Yustisia Jurnal Hukum, 5(2). https://doi.org/10.20961/yustisia.v5i2.8744

Revayanti, I. (2020). Dampak Pembangunan Jalan Tol Bocimi Terhadap Sosial, Ekonomi Masyarakat di Kabupaten Sukabumi. Geo Planart, 2(2).

Shofi, Z. D. F., Subekti, R., & Raharjo, P. S. (2022). ASPEK HUKUM GANTI RUGI DALAM PENGADAAN TANAH UNTUK KEPENTINGAN UMUM. Jurnal Komunitas Yustisia, 5(1), 290–299. https://doi.org/10.23887/jatayu.v5i1.46072

Situmorang, A. S., & Nugroho, M. A. (2022). Penyelesaian Sengketa Ganti Rugi Dalam Pengadaan Tanah Untuk Kepentingan Umum. Jurnal Kewarganegaraan, 6(2).

Subekti, R. (2016). KEBIJAKAN PEMBERIAN GANTI KERUGIAN DALAM PENGADAAN TANAH BAGI PEMBANGUNAN UNTUK KEPENTINGAN UMUM. Yustisia Jurnal Hukum, 5(2). https://doi.org/10.20961/yustisia.v5i2.8754

Sumaryoto. (2010). DAMPAK KEBERADAAN JALAN TOL TERHADAP KONDISI FISIK, SOSIAL, DAN EKONOMI LINGKUNGANNYA. Journal of Rural and Development, 1(2).

Wibowo, S. N., Pujiwati, Y., & Rubiati, B. (2021). KEPASTIAN HUKUM GANTI KERUGIAN PENGADAAN TANAH BAGI PEMBANGUNAN JALAN TOL CISUMDAWU. Acta Diurnal Jurnal Ilmu Hukum Kenotariatan Dan Ke-PPAT-An, 4(2). https://doi.org/10.23920/acta.v4i2.480

Winarda, R. Z., Mardiyanto, J., & Sutarni, N. (2021). Pelaksanaan Pengadaan Tanah Untuk Pembangunan Jalan Tol Yogyakarta - Solo Di Kabupaten Boyolali (Studi Kasus Pembangunan Jalan Tol Kulon Progo Yogyakarta-Solo). Jurnal Bedah Hukum, 5(2), 202–221. https://doi.org/10.36596/jbh.v5i2.661

Downloads

Published

2024-06-03